Causes and preventive measures of pipeline blockage in central feeding system |
source:Central feeding system Author:Central feeding system time:2020-08-27 10:42:26 |
|||
Causes and preventive measures of pipeline blockage in central feeding system The pipeline is an indispensable connecting device for the central feeding system. If it is not well laid out, the impact will be particularly great. Therefore, the basic layout principles must be followed to ensure efficient and smooth production. During the operation of the central feeding system, pipeline blockages often occur. Of course, there are many reasons. It is necessary for manufacturers to discover these possible situations and take precautions to ensure the stable operation of the central feeding system. 1. Consider the rationality of the configuration of the entire production equipment and conveying system to facilitate production. 2. The pipeline installation, overhaul and maintenance of the central feeding system should be convenient. 3. The conveying pipe should be as short as possible under the premise of meeting the conveying requirements. 4. The number of elbows in the central feeding system should be as few as possible, especially elbows that transition from horizontal to vertical should be used as few as possible. 5. The horizontal tube should not be too long, otherwise it will easily cause adverse consequences. 1. Reasons for the blockage of the central feeding system pipeline 1. Too much dust in the crushed material. 2. The pulsation dust collector is full of dust and not cleaned up in time, causing the vacuum tube to be blocked. 2. Prevention and Solution of Pipeline Blockage of Central Feeding System 1. The preventive measure is to provide relevant operators with maintenance training. 2. It is recommended that the pulsation dust collector should be cleaned 4 times or more per shift. 3. It is recommended to add a dust filter collection device to reduce the working load of the pulsating dust collector. Precautions are tested in strict accordance with factory workshop standards.
|
Central feeding system technology and maintenance |
Dehumidification dryer | gravimetric blender | plastic granules mixing machine |
Links: | plastic dryer | Dehumidifying Dryer | gravimetric blender | Central feeding system |
company name: | Dongguan Machinery Equipment Co., Ltd. |
Phone/WeChat: | +86-13669807274 | Whatapp: | +86-13669807274 | E-mail: | wto-btb@wto-btb.com |
Address: | 168 Guangming New Street, Dongcheng District, Dongguan City, Guangdong Province, China |
Website real name: | Central feeding system | copyright: | Central feeding system |
industry search: | Central feeding system | Central conveying system | ©2007-2029 @ |